请中译英下面一段话,"为确定沿空双巷合理煤柱宽度,以唐安矿3405综放工作面为工程地质技术条件,采用《FLAC3D》软件
最佳回答
最新回答共有2条回答
-
2026-04-02 16:59:13欢呼的大米
回复In order to determine the rational coal pillar width along double gob-side entry,taking the 3405 fully-mechanized caving face of Tang’an Coal Mine as the technological conditions of engineering geology,the deformation law of the surrounding rock and plastic failure status under five different size conditions,i。e。the tunnel coal pillar being 2m,4m,8m,12m,and 20m are simulated and analyzed using FLAC3D software,and the stabilized control technology for surrounding rock which dynamic pressure is along double gob-side entry is explored through physical simulation。Through study it is held that adopting narrow coal pillar about 4m for the tunnel coal pillar is the most economical one in the same geologic conditions,and employing “beam net-cable integrated” supporting technology can effectively control the stability of the dynamic pressure along the double gob-side entry in different periods。
热门文章
- 康达学院专转本五年制
- 高考一个考场分ab卷吗
- not only but also用法
- 某物体做自由落体运动,从释放开始计时,则物体在前2s内的平均速度为______m/s,物体下落2m时的速度大小为______m/s.
- 三角函数公式大全表格
- 地理中考必背知识点2022
- 2013-2014学年小学六年级科学上学期期末考试试卷及答案
- 人教版2014-2015学年小学五年级英语第二学期期中教学质量检测试卷及答案
- 【Linux驱动开发】设备树详解(二)设备树语法详解
- 别跟客户扯细节
- 在别的城市买房子能落户吗
- 卖房前要把装修贷还完吗
- 高中政治教学提高教学效果的方法探究
- “互联网+”背景下的初中英语课堂教学改革与创新策略研究
- 2022年终止合同范本
- 租房合同范本范文
- 如何挑选土豆
- 如何挑选土鸡
