中译英,一段文字,谢谢~~
最佳回答
最新回答共有2条回答
-
2026-04-11 10:47:36内向的冰棍
回复Liantang project introductionAs to the 220kv line outlet project of 500kv Liantang transformer substation project,the overall length of the new line is 81。9km,via three districts of Songjiang,Qingpu,Jinshan。There are 12 turns using trolly wire in the line outlet of this project,4 turns in Ganlian,2 turns in Qingpu,4 turns in Chenta,2 turns in Wanan; with two loops in the same tower,four loops of trolly wire,the voltaic wire is 2×JL/LB1A-630/45,and the earth wire is ACSR/AS-80/47。The weather condition is:designed wind speed:30 m/s,ice load:5mm,maximum temperature:+40 ℃,minimum temperature:-10℃,yearly average temperature:15℃。Degree of pollution is III in the areas passing by。The project need to cross Mao River,Lanlu Port,Taipu River,and some other planned important rivers and roads,such as A15,A30 and so on。As to the line across Mao River,the width of the river is around 420m,the lowest height which is in Wusong is higher than 27m。The project is considered to use the method of tension-tangent-tension-tangent for crossing in the early stage,the length is around 550m,the tower type is ZT4-66,the height from the lowest transverse plane of the tower to the ground is 66m,and the full height is 82。7m,the picture of the tower is as below。
热门文章
- 康达学院专转本五年制
- 高考一个考场分ab卷吗
- not only but also用法
- 某物体做自由落体运动,从释放开始计时,则物体在前2s内的平均速度为______m/s,物体下落2m时的速度大小为______m/s.
- 三角函数公式大全表格
- 地理中考必背知识点2022
- 2013-2014学年小学六年级科学上学期期末考试试卷及答案
- 人教版2014-2015学年小学五年级英语第二学期期中教学质量检测试卷及答案
- 【Linux驱动开发】设备树详解(二)设备树语法详解
- 别跟客户扯细节
- 在别的城市买房子能落户吗
- 卖房前要把装修贷还完吗
- 高中政治教学提高教学效果的方法探究
- “互联网+”背景下的初中英语课堂教学改革与创新策略研究
- 2022年终止合同范本
- 租房合同范本范文
- 如何挑选土豆
- 如何挑选土鸡
