英语翻译The quantities given in the Bill of Quantities are estim
英语翻译The quantities given in the Bill of Quantities are estimated and provisional,and are given to provide a common basis for bidding.The basis of payment will be the actual quantities of work ordered and carried out,as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities,where applicable,and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.The rates and prices of major materials (steel pipes,electromagnetic meters and valves) will be paid upon delivered to the site according to the related items in the Technical Specifications.===================不好意思.就是以上几句了,快回答,过时不候!
最佳回答
工程量清单中列出的工程只是估计的、临时的数量。之所以给出这些信息是为了给投标一个共同的基础。支付的基础则是实际安排的和完成的工作。由承包人来计算、工程师进行核实,并且在可以的时候按照工程量清单中的费用和价格计算。如不能的情况下则由工程师按照合同的条款进行修改。主要材料(钢管、点此仪表和真空管)的价格根据技术要求交付到施工地点后进行付费。
最新回答共有2条回答
-
2026-04-08 00:44:17感动的小丸子
回复工程量清单中列出的工程只是估计的、临时的数量。之所以给出这些信息是为了给投标一个共同的基础。支付的基础则是实际安排的和完成的工作。由承包人来计算、工程师进行核实,并且在可以的时候按照工程量清单中的费用和价格计算。如不能的情况下则由工程师按照合同的条款进行修改。主要材料(钢管、点此仪表和真空管)的价格根据技术要求交付到施工地点后进行付费。
热门文章
- 康达学院专转本五年制
- 高考一个考场分ab卷吗
- not only but also用法
- 某物体做自由落体运动,从释放开始计时,则物体在前2s内的平均速度为______m/s,物体下落2m时的速度大小为______m/s.
- 三角函数公式大全表格
- 地理中考必背知识点2022
- 2013-2014学年小学六年级科学上学期期末考试试卷及答案
- 人教版2014-2015学年小学五年级英语第二学期期中教学质量检测试卷及答案
- 【Linux驱动开发】设备树详解(二)设备树语法详解
- 别跟客户扯细节
- 在别的城市买房子能落户吗
- 卖房前要把装修贷还完吗
- 高中政治教学提高教学效果的方法探究
- “互联网+”背景下的初中英语课堂教学改革与创新策略研究
- 2022年终止合同范本
- 租房合同范本范文
- 如何挑选土豆
- 如何挑选土鸡