英语翻译建议今后的施工图设计尽量详细,材料统计尽量全面.合同应该增加一条,是开口合同还是闭口合同,如果是开口合同就由买方

学习 时间:2026-04-03 12:10:36 阅读:5190
英语翻译建议今后的施工图设计尽量详细,材料统计尽量全面.合同应该增加一条,是开口合同还是闭口合同,如果是开口合同就由买方承担多出的材料费,如果是闭口合同就由卖方承担.

最佳回答

飘逸的胡萝卜

笑点低的小兔子

2026-04-03 12:10:36

Suggestions to the future construction drawing design, materials as comprehensive statistics in detail。 The contract should be added, is open and shut the contract or contract is open, if the contract is assumed by the buyer, the cost more, if the contract is silent is borne by the seller。

最新回答共有2条回答

  • 执着的跳跳糖
    回复
    2026-04-03 12:10:36

    Suggestions to the future construction drawing design, materials as comprehensive statistics in detail。 The contract should be added, is open and shut the contract or contract is open, if the contract is assumed by the buyer, the cost more, if the contract is silent is borne by the seller。

上一篇 中国近代民族工业包括洋务企业吗?

下一篇 日本是怎样崛起的?